Tour of the Plant

High Head Tank
 
The High Head Tank is the first stop for the treated water that will be distributed to Blacksburg and Christiansburg.
 
High Head Tank       Merrimac Tank
Photo of the High Head Tank       Photo1 of the Merrimac Tank

Photo2 of the Merrimac Tank
 
   
 
  

Home | About Us | Water Quality | Education | Information | Site Index